Jd1000mm Microtunneling Boring Machine for Urban Construction Pipeline

Jd1000mm Microtunneling Boring Machine for Urban Construction Pipeline

Principal Components Brand :

No. Part Name Brand
1 Equipment Reducers Dinamic/ Bonfiglioli
two PLC program controller MITSUBISHI,Japan
three Touch Display MITSUBISHI,Japan
4 Steering Solenoid valve BMEG,Germany
5 CZPT valve BMEG,Germany
six Major CZPTtrical elements Schneider
seven Strain oil pump ZheJiang shenfu
8 CZPTtric motor Siemens
nine Major axle content 42CrMo
ten Alloy cutter substance Tungsten carbide YG11
11 Shell material Q235

 

Major CZPT Specification
No. Model OD*L Main Electricity Rectify system Oil cylinder thrust Optimum torque of Reducing Head (KN.M) Rpm of Slicing Head (r/min) Oil cylinder thrust of Main CZPT Stress of oil cylinder(Mpa) Discharge Pipe Dimension (mm)
one JR500 Φ695*2950 22*1 220KN*four 15.three thirteen.7 200T*2 31.5 Φ75
2 JR600 Φ795*2840 22*one 310KN*4 fifteen.three thirteen.seven 200T*2 31.5 Φ75
three JR800 Φ980*4400 30*1 550KN*five 57 five 200T*2 31.five Φ100
4 JR1000 Φ1220*4400 fifteen*3 480KN*4 89 3.two 200T*two 31.5 Φ100
5 JR1200 Φ1460*3800 18.5*3 630KN*4 177 2.7 200T*2 31.5 Φ100
/22*three
six JR1350 Φ1640*4500 22*3 630KN*4 177 2.seven 200T*two 31.five Φ125
seven JR1500 Φ1820*5000 thirty*3 630KN*four 276 2.seven 200T*two 31.five Φ125
/1600 /Φ2000*5000
8 JR1800 Φ2180*5000 30*four 800KN*eight 415 two.five 200T*4 31.five Φ125
/2000 /Φ2420*5000 200T*six
9 JR2200 Φ2660*5200 37*four 800KN*eight 553 2.5 200T*6 31.5 Φ150
ten JR2400 Φ2900*5600 thirty*6 990KN*8 553 2.5 200T*6 31.5 Φ150
eleven JR2600 Φ3160*5850 37*six 990KN*eight 837 two.five 200T*8 31.five Φ150
/2800 /Φ3350*5850
twelve JR3000 Φ3580*5900 37*8 1240KN*8 1719 two.five 200T*8 31.five Φ150

Inside Framework :

Crushing Head Information :

Principal Axis and Gear Reducers  Details :

CZPTtric Cabinet Details :

CZPT Case :

Merchandise Description :
Pipe Jacking CZPT 2000mm made for huge pipe jacking engineering , generally utilized in the construction of cement pipe crossings, building houses translation, sewers, roadways and rivers as a sheathing of other tasks across a variety of channels.

Basic principle :
Pipe jacking construction is in the work in the pit ,by means of jacking CZPT which produce jacking force, and get over the friction amongst the pipes and the bordering soil.
Jacking the pipes Into the soil at the style slope.and Eliminated soils .
Right after a section of pipe end jacking into the soil , then the CZPT section of the pipes carry on to jack into the soil , The basic principle is by means of the thrust of the primary cylinder    pipeline, intermediate jacking station,and other thrust pushing the device pipe or heading equipment (by way of the soil )from doing work well to the receiving nicely and Raise up. Then , embed the pipes among the two wells.
 
Primary Functions:
Entire Part rock earth strain display program.
The separated single grouting method for cutter panel and spindle heart.
The rear of jacking pipe device outfitted with jacking system and stop deviation system.
Disk cutter adopts CZPT China model.
Planetary gearbox adopts Italian BREVINI.
Undertake contact display, PLC CZPT and other sophisticated handle system.
The information displayed on the contact monitor can be linked to users  office check by means of RS232 interface.

Advantage :
The advantage of this technique is no excavation on the floor,Do not demolition,Does not destroy the ground buildingsDon’t injury the atmosphere,Does not have an effect on pipeline segment deformation,Time-conserving, efficient, secure, reduced general cost.
The technological innovation are extensively utilised in city underground drinking water provide and drainage pipeline,CZPT fuel pipeline,Interaction cable and other non excavation laying.It can by means of the freeway, railway, bridge, mountains, rivers, channel and any constructing on the floor.The use of the engineering design, can save a large volume of land acquisition and demolition charges,also can minimize environmental pollution and highway congestion,It has important economic and social positive aspects.

Functioning Frequency :
one.Employing in ROCK condition
two.Extensively employed in CZPT Asian international locations, ZheJiang , and Japan.
three.Within cement pipe dia from 1000-3200 mm
four.Professional company who can create ROCK pipe jacking device in China.
 
CZPT & CZPT :
Nude Packing
Delivery Detail:
60 days after thirty% deposit getting
 
Our Providers :
 We will deliver expert technician to your task website to function the pipe jacking device and teach operators for the project,  
one.On site provider help
two. 12month warranty
three.Lifestyle time service assistance,
four. 7 days*24hours Scorching-line & Email Services. 
5.Your inquiry associated to our pipe jacking machine will be replied within 24 hrs.Properly-skilled and experienced workers will response all your inquiries in fluent English.
 
Guarantee :
If quality & assembling difficulty caused problems, we just take accountable on spare parts and all provider charges.
If misuse or human factors brought on the difficulties, consumers shall take dependable on spare areas and all provider costs.

Chinese Patent of Compund Pipe Jacking CZPT

1.Introduction to CZPT Functionality
A.The complete machine is water-proof (Chinese patent amount ZL201822154528.).
B.By taking away the crushing wheel and the attachment of cutter head ,  this  machine can be remoulded to the panel equipment which is far more efficient  for silty clay layer construction and the device can be remoulded in the construction website.(add-ons integrated)
C.There is no need to return to the manufacturing facility.By changing the rock cutter head on the internet site and connecting the front keep an eye on, the rock machine required for pure rock geology can be formed (marketed separately).
D.According to several several years of design expertise, we merged with true working conditions.We  developed electronic built-in management method independently, that can handle the  pump and valve team elements integratedly throughout the whole design process.Also, the whole method of construction  can be practical, straightforward, risk-free and dependable.

two. Geological circumstances applicable to factory equipment (patent software quantity 201915715.4)
A.It is suitable for pebble layer, sand pebble layer, soil pebble layer with particle dimension <= 30% of its own pipe diameter.
B.Miscellaneous filling layer (no metal bar, huge quantity of non-degradable delicate domestic rubbish), basic filling layer
C.Suited for all sorts of difficult non-strongly cohesive soil levels with uniaxial compressive toughness <= 10MPa
D.Merged with soil improvement media to adapt to different sand levels

3.Particular Design and style
Power method of the products , correction system of the pumping station, bypass technique, pressure checking technique and control technique can all be made for intercommunication of adjacent pipe diameters.Instance:Ø800 and Ø1000 can be shared

The CZPTence of Cutting Head of Compound Pipe Jacking CZPT

Venture Situation :

Supply info and support right after market :

1)PAYMENT Terms:
T/T :30% as advance payment and T/T 70% paid out just before shipment
2) DELIVERY  :
30 days right after receipt of thirty% progress payment
three )Service Right after Promote:
Energy box, motor, reducer box warranty period of time is 1 year, throughout this a single yr services , non-human or unnatural disasters which led to any difficulties, we offer cost-free upkeep support to buyer’s CZPT Web site.
CZPT program, electrical system warranty time period is six months, These kinds of as human factors direct to any issues and require to change with new 1, we will market the CZPT and electrical areas at our price cost , buyer will bear the value of CZPT and electrical elements and CZPT express fees.
After the device arrived at your CZPT web site, we will send 2 machine operators whose salary is USD200/working day, kindly also supply our folks ‘s place and meals and round excursion air tickets during the period of time of development.

Jd1000mm Microtunneling Boring Machine for Urban Construction Pipeline